Pump Room Rectification Works - VILLA MYRA
Break Down Posted On: October 7, 2026 Closing On: October 13, 2026
JOB REFERENCE:
JB
Pump Room Snags Rectification Works
Scope of Work:
- Replace Filter Pump 1 with Astral Pool 3 HP pump – Quantity: 1 No.
- Carry out NRV, Allied HPVC fittings and plumbing alteration works for Filter Pump 1.
- Replace Filter Pump 2 with Astral Pool 3 HP pump – Quantity: 1 No.
- Carry out NRV, Allied HPVC fittings and plumbing alteration works for Filter Pump 2.
- Replace Filter Pump 3 with Astral Pool 3 HP pump – Quantity: 1 No.
- Carry out NRV, Allied HPVC fittings and plumbing alteration works for Filter Pump 3.
- Replace Adult Pool Lights with LED Astral 18 W–12 W lights – Quantity: 6 Nos.
- Replace Kids Pool Light with Astral 7 W light – Quantity: 1 No.
- Replace Sand Filter 2 pressure gauge with Astral Pool pressure gauge – Quantity: 1 No.
- Replace Skimmer Line Valve with Anti Block 2-inch valve – Quantity: 1 No.
- Replace Vacuum Hose with PROTEAM 18-meter hose – Quantity: 1 No.
- Replace Vacuum Handle with PROTEAM handle – Quantity: 1 No.
- Conduct a site inspection to verify the scope of work and provide complete technical details, including the proposed brand name and sample pictures, along with the proposal.
Villa Myra
Residential
Villa Myra, Jumeirah Village Circle, Dubai, United Arab Emirates
#J-18808-Ljbffr
This listing is sourced from a third-party job board. Applying will redirect you to the original posting.